North, Pune · Ravet / Kiwale / Moshi / Chikhali / Dehu Road

Is Ravet / Kiwale / Moshi / Chikhali / Dehu Road good for investment?

130 RERA-registered projects scored on one model, as of November 11, 2026. Prices, growth, yields, supply and the best-scored homes.

Straight answer · as of November 11, 2026

Ravet / Kiwale / Moshi / Chikhali / Dehu Road in one paragraph

On PropertyLens's model, Ravet / Kiwale / Moshi / Chikhali / Dehu Road is a weaker-than-average place to buy in Pune right now: the median analysed project scores 44/100 (below the Pune average), with projected price growth of 7.6% a year over five years and a median gross rental yield of 3.3%. Unsold homes would take about 20 months to absorb at the current sales pace, which is heavy supply and caps near-term price growth. 12 of 95 under-construction projects here are past their original RERA completion date, so weight the developer's record heavily.

Median of 130 projects; the spread inside the area is wide, so the ranked list below matters more than the average.

Projects analysed
130
35 ready · 95 under construction
Median score
44
below the Pune average
Projected growth / yr
7.6%
5-yr; 10-yr 7.5%
Median price / sq ft
₹5,350
modelled from comparables
Gross rental yield
3.3%
median, on all-in cost
Net-wealth CAGR
2.4%
8-yr hold, 75% loan, after all costs
Months of inventory
20
RERA filings
Past RERA date
12 / 95
under-construction projects overdue
Entry price
₹22.1 L
median ₹40.1 L

Best-scored projects in Ravet / Kiwale / Moshi / Chikhali / Dehu Road

All 130 analysed projects in Ravet / Kiwale / Moshi / Chikhali / Dehu Road

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
Little Earth, Kiwale - Building B7
Kolte-Patil · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
548.8%3.7%6.8%₹6,850 est.₹51.4 LUnder construction
Apr 2031
The Forestia
Prestige · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
528.8%3.5%5.9%₹6,850 est.₹51.4 LUnder construction
Dec 2029
Destination 24 Avenue - Premium Row House Plots
D R Gavhane Landmarks · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
518.7%4.1%5.8%₹3,150 est.₹23.6 LReady
Miami A4-A5
Pride Purple · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
518.8%3.2%5.4%₹5,350 est.₹40.1 LUnder construction
Dec 2029
L Axis Phase III Cluster B
Pharande Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
508.9%3.4%6.3%₹5,350 est.₹40.1 LUnder construction
Mar 2031
Little Earth, Kiwale - Building D1
Kolte-Patil · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
508.4%2.6%4.1%₹6,850 est.₹51.4 LUnder construction
Jun 2029
Little Earth, Kiwale - Buildng D2
Kolte-Patil · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
508.4%2.6%4.1%₹6,850 est.₹51.4 LUnder construction
Jun 2029
Little Earth, Kiwale-Building C12
Kolte-Patil · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
508.0%2.3%3.5%₹6,850 est.₹51.4 LUnder construction
Dec 2027
Lodha Belmondo - Tower 32
Lodha (Macrotech) · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
498.4%3.0%4.9%₹9,100 est.₹68.3 LUnder construction
Oct 2028
Little Earth, Kiwale- Building B11
Kolte-Patil · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
497.6%1.4%1.9%₹6,850 est.₹51.4 LUnder construction
Dec 2026
Little Earth, Kiwale Building C10 And C11
Kolte-Patil · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
497.6%1.4%1.9%₹6,850 est.₹51.4 LUnder construction
Dec 2026
Montreal F-G
Charholi Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
498.8%3.2%6.0%₹5,350 est.₹40.1 LUnder construction
May 2031
Little Earth, Kiwale - Building C13
Kolte-Patil · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
498.0%2.0%3.0%₹6,850 est.₹51.4 LUnder construction
Jun 2028
Little Earth, Kiwale - Building C14
Kolte-Patil · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
498.0%2.0%3.0%₹6,850 est.₹51.4 LUnder construction
Jun 2028
Little Earth, Kiwale Building C16
Kolte-Patil · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
497.2%2.6%3.4%₹7,300 est.₹54.8 LReady
Sai Empire - Plot C
Sai Angan Empire · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
488.7%4.1%5.8%₹3,150 est.₹23.6 LReady
Miami A6-A7-B1
Pride Purple · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
488.4%2.6%4.2%₹5,350 est.₹40.1 LUnder construction
Dec 2028
L-Axis Phase III Cluster C
Pharande Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
488.8%3.0%5.8%₹5,350 est.₹40.1 LUnder construction
Jul 2031
Pharande Vivir Cluster A
Pharande Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
488.8%3.0%5.8%₹5,350 est.₹40.1 LUnder construction
Jul 2031
Lodha Belmondo - Tower 30
Lodha (Macrotech) · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
487.6%1.4%1.9%₹9,100 est.₹68.3 LUnder construction
Dec 2026
L-Square Prime
Lodha (Macrotech) · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
487.6%1.4%1.9%₹9,100 est.₹68.3 LUnder construction
Dec 2026
Wellington-E-H-J-K
Pride Purple · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
478.0%2.1%3.2%₹5,350 est.₹40.1 LUnder construction
Dec 2027
Wellington F-G
Pride Purple · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
478.0%2.1%3.2%₹5,350 est.₹40.1 LUnder construction
Dec 2027
Sara Oasis
Jagrutsara Structures · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
479.0%3.6%6.6%₹5,350 est.₹40.1 LUnder construction
Dec 2030
Pharande Vivir Cluster C
Pharande Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
478.7%2.9%5.5%₹5,350 est.₹40.1 LUnder construction
Sep 2031
Lodha Belmondo St. Andrews A
Lodha (Macrotech) · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
477.6%1.4%1.8%₹9,100 est.₹68.3 LUnder construction
Feb 2027
Shreeji Sharan
Prestige · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
477.2%2.6%3.4%₹7,300 est.₹54.8 LReady
Swastik Homes
Prestige · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
477.2%2.6%3.4%₹7,300 est.₹54.8 LReady
Shreeji Sharan B Wing
Prestige · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
477.2%2.6%3.4%₹7,300 est.₹54.8 LReady
Lodha Belmondo - Townhouses
Lodha (Macrotech) · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
477.2%2.4%3.2%₹9,650 est.₹72.4 LReady
Lodha Belmondo - Tower 31
Lodha (Macrotech) · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
477.2%2.4%3.2%₹9,650 est.₹72.4 LReady
AshokVistas by Peninsula Land Phase 1
Peninsula Land · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
477.6%1.4%1.9%₹9,100 est.₹68.3 LUnder construction
Dec 2026
Sparkle At Godrej Serene
Godrej Properties · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
478.0%2.3%3.5%₹6,850 est.₹51.4 LUnder construction
Dec 2027
Aishwaryam Anand
Sai Essen Developers · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
478.8%3.2%5.4%₹5,350 est.₹40.1 LUnder construction
Dec 2029
Rio Tower
Charholi Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
468.4%2.6%4.2%₹5,350 est.₹40.1 LUnder construction
Dec 2028
Montreal - E-H
Charholi Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
468.4%2.6%4.2%₹5,350 est.₹40.1 LUnder construction
Dec 2028
Kumar Parv A, B, C, D AND E
Kumar Properties · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
468.6%4.2%8.3%₹6,850 est.₹51.4 LUnder construction
Dec 2031
Peninsula AshokVann Phase 1
Peninsula Land · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
467.2%2.4%3.2%₹9,650 est.₹72.4 LReady
Peninsula AshokVann Phase 2
Peninsula Land · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
467.2%2.4%3.2%₹9,650 est.₹72.4 LReady
Peninsula AshokVann Phase 3
Peninsula Land · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
467.2%2.4%3.2%₹9,650 est.₹72.4 LReady
Stella A
Dmk Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
468.8%3.2%5.4%₹5,350 est.₹40.1 LUnder construction
Dec 2029
Wellington- N-O
Pride Purple · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
467.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Stella F1
Dmk Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
467.6%1.3%1.7%₹5,350 est.₹40.1 LUnder construction
Jan 2027
AshokVistas by Peninsula Land - Phase 2
Peninsula Land · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
467.6%1.6%2.3%₹9,100 est.₹68.3 LUnder construction
Jun 2027
Shree Sadguru Residency
Namrata Group · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
467.6%1.3%1.7%₹5,350 est.₹40.1 LUnder construction
Feb 2027
Ganesh Siddhi Phase 5
Ganeshconstruction · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
458.8%3.2%5.4%₹5,350 est.₹40.1 LUnder construction
Dec 2029
L Axis Phase III Cluster A
Pharande Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
458.0%1.8%2.7%₹5,350 est.₹40.1 LUnder construction
Jul 2028
Spring Gardens Phase-III
Achalare Realtors · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
457.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Dec 2026
Sai Empire - Plot A
Sai Angan Empire · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
459.1%4.5%6.6%₹2,950 est.₹22.1 LUnder construction
Dec 2026
Mamurdi MHADA North
Godrej Properties · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
457.2%2.6%3.4%₹7,300 est.₹54.8 LReady
Godrej Wood Park
Godrej Properties · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
457.2%2.6%3.4%₹7,300 est.₹54.8 LReady
Shantay Residency
Siddhivinayak Developers · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
457.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Kumar Parv F, G AND H
Kumar Properties · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
458.4%2.9%4.6%₹6,850 est.₹51.4 LUnder construction
Dec 2028
KAMALRAJ AKSHARDHAM B and C BUILDING
Kamalraj Estate · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
458.4%2.6%4.2%₹5,350 est.₹40.1 LUnder construction
Dec 2028
Kamalraj Akshardham A Building
Kamalraj Estate · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
458.4%2.6%4.2%₹5,350 est.₹40.1 LUnder construction
Dec 2028
Ashok Villas Grande
Peninsula Land · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
458.8%3.7%6.3%₹9,100 est.₹68.3 LUnder construction
Dec 2029
Godrej Serene
Godrej Properties · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
457.6%1.5%2.1%₹6,850 est.₹51.4 LUnder construction
Jun 2027
Pharande Prowess
Pharande Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
458.0%1.7%2.6%₹5,350 est.₹40.1 LUnder construction
Sep 2028
Vaanya Cluster C
Pharande Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
457.6%1.4%1.9%₹5,350 est.₹40.1 LUnder construction
Jun 2027
Vaanya Cluster D
Pharande Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
457.6%1.4%1.9%₹5,350 est.₹40.1 LUnder construction
Jun 2027
Lodha Belmondo Townhouse 2
Lodha (Macrotech) · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
457.6%1.4%1.9%₹9,100 est.₹68.3 LUnder construction
Nov 2026
Stella B1
Dmk Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
457.6%1.4%1.8%₹5,350 est.₹40.1 LUnder construction
Nov 2026
Itrend Waterfront
Neev Sai Developers · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
447.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Destination Ostia Building E1
D R Gavhane Landmarks · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
447.6%1.6%2.2%₹5,350 est.₹40.1 LUnder construction
Apr 2027
NAKSHATRA i LAND – PHASE 8
Ellora Buildwell · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
448.4%2.3%3.7%₹5,350 est.₹40.1 LUnder construction
Jul 2029
Sukhwani Artize
Sukhwani Constructions · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
447.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Montreal - A-B-C-D
Charholi Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
448.0%2.1%3.2%₹5,350 est.₹40.1 LUnder construction
Dec 2027
Sukhwani Palmera Reserves Phase I
Sukhwani Constructions · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
448.9%3.4%6.3%₹5,350 est.₹40.1 LUnder construction
Mar 2031
Ace Aurum III Tower 04
Jhamtani Realty · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
447.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Sai Empire G
Sai Angan Projects · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
447.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Sai Empire J
Sai Angan Projects · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
447.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Belmondo Townhouse 4
Lodha (Macrotech) · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
448.7%3.4%5.8%₹9,100 est.₹68.3 LUnder construction
Aug 2030
Millennium Amara Phase 2
Millennium Developers · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
448.8%3.2%5.4%₹5,350 est.₹40.1 LUnder construction
Dec 2029
Destination 24 Avenue D Building
D R Gavhane Landmarks · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
437.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Sep 2027
Nakshatra i Land Phase 5
Ellora Buildwell · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
437.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Dec 2026
Nakshatra i Land Phase - 7
Ellora Buildwell · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
438.0%2.0%3.0%₹5,350 est.₹40.1 LUnder construction
Apr 2028
Destination Ostia Building F1
D R Gavhane Landmarks · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
437.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Dec 2026
Stella D3
Dmk Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
437.6%1.4%2.0%₹5,350 est.₹40.1 LUnder construction
May 2027
Miami-A1-A2-A3-B2
Pride Purple · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
438.8%3.2%5.4%₹5,350 est.₹40.1 LUnder construction
Dec 2029
Kumar Pratham - F Mhada
Kumar Agro Products · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
437.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Ganesh Siddhi Phase 4
Ganeshconstruction · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
438.4%2.6%4.2%₹5,350 est.₹40.1 LUnder construction
Dec 2028
Ashok Villas Imperial
Peninsula Land · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
438.8%3.7%6.3%₹9,100 est.₹68.3 LUnder construction
Dec 2029
Stella B3
Dmk Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
438.4%2.5%4.0%₹5,350 est.₹40.1 LUnder construction
Mar 2029
Kamalraj Dattavihar Central
Kamalraj Estate · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
437.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Gini Vivante Phase 02
Gini Citicorp Realty · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
438.0%2.1%3.2%₹5,350 est.₹40.1 LUnder construction
Dec 2027
Destination 24 Avenue A Building
D R Gavhane Landmarks · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
437.6%1.6%2.3%₹5,350 est.₹40.1 LUnder construction
Mar 2027
Spring Gardens Phase - I
Achalare Realtors · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
427.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Little Earth Masulkar City Phase 3
Kolte-Patil · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
427.2%2.6%3.4%₹7,300 est.₹54.8 LReady
Stella B2
Dmk Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
428.0%2.1%3.0%₹5,350 est.₹40.1 LUnder construction
Mar 2028
Destination 24 Avenue C Building
D R Gavhane Landmarks · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
427.6%1.4%1.8%₹5,350 est.₹40.1 LUnder construction
Nov 2026
Destination 12 Gems
D R Gavhane Landmarks · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
427.6%1.4%1.9%₹5,350 est.₹40.1 LUnder construction
Jul 2027
Gini Vivante Phase 03
Gini Citicorp Realty · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
418.4%2.6%4.2%₹5,350 est.₹40.1 LUnder construction
Dec 2028
Sai Empire H
Sai Angan Empire · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
417.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Destination Ostia Building G1
D R Gavhane Landmarks · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
417.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Dec 2026
Sai Empire - Plot B
Sai Angan Projects · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
419.1%4.6%6.6%₹2,950 est.₹22.1 LUnder construction
Dec 2025
Ganesh Siddhi C1 C2
Ganeshconstruction · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
417.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Spring Gardens Phase II
Achalare Realtors · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
417.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Rudraksh Home
Gurudatta Developers · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
408.0%2.1%3.2%₹5,350 est.₹40.1 LUnder construction
Dec 2027
Aryaban
Aurigaa Realtors · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
408.0%2.1%3.2%₹5,350 est.₹40.1 LUnder construction
Dec 2027
Gini Vivante Phase 01
Gini Citicorp Realty · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
407.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Dec 2026
Gini Vibrance
Gini Citicorp Realty · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
407.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Dec 2026
Millennium Amara
Millennium Developers · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
408.0%2.1%3.0%₹5,350 est.₹40.1 LUnder construction
Mar 2028
Krystal One Phase IV
Rama Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
408.0%2.1%3.2%₹5,350 est.₹40.1 LUnder construction
Dec 2027
Ace Aster
Jhamtani Realty · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
408.4%2.5%4.0%₹5,350 est.₹40.1 LUnder construction
Mar 2029
Shubh Aarambh
Siddhivinayak Developers · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
407.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Forest Grove At Godrej Park Greens
Godrej Properties · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
407.6%1.5%2.0%₹6,850 est.₹51.4 LUnder construction
Sep 2027
Crown C1
Dmk Infrastructure · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
397.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Lodha Belmondo Townhouse 3
Lodha (Macrotech) · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
397.6%1.5%1.9%₹9,100 est.₹68.3 LUnder construction
Mar 2026
Godrej Park Greens
Godrej Properties · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
398.0%2.2%3.3%₹6,850 est.₹51.4 LUnder construction
Mar 2028
addressOne - Phase 5
Peninsula Land · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
397.2%2.4%3.2%₹9,650 est.₹72.4 LReady
Sukhwani Nysa
Sukhwani Constructions · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
397.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Ganesh Siddhi Wing D
Ganeshconstruction · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
397.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Dec 2026
Sukhwani Aspire
Sukhwani Constructions · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
397.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Ganesh Siddhi E Wing
Ganeshconstruction · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
397.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Dec 2026
Krystal One Phase I
Rama Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
387.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Ace Atmosphere Phase I
Jhamtani Realty · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
377.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Sep 2027
Nakshatra I Land Phase 3
Ellora Buildwell · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
377.6%1.4%1.7%₹5,350 est.₹40.1 LUnder construction
Jun 2026
Celestial City Phase II Building A, E, H
Rama Synergy Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
377.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Destination 24 Avenue B Building
D R Gavhane Landmarks · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
367.6%1.4%1.7%₹5,350 est.₹40.1 LUnder construction
Mar 2026
Madhuban
Godrej Properties · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
367.6%1.5%1.9%₹6,850 est.₹51.4 LUnder construction
Sep 2026
Krystal One Phase III
Rama Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
367.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Dec 2026
Aishwaryam Hamara Gaurav
Sai Essen Developers · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
357.6%1.4%1.7%₹5,350 est.₹40.1 LUnder construction
Aug 2026
Godrej Nurture
Godrej Properties · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
357.6%1.5%1.9%₹6,850 est.₹51.4 LUnder construction
Sep 2026
Gods County A Wing
Ganeshconstruction · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
347.2%2.7%3.4%₹5,700 est.₹42.8 LReady
Royal Orchid Residency
Balaji Developers · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
347.6%1.4%1.7%₹5,350 est.₹40.1 LUnder construction
Dec 2025
Gods County C Wing
Ganeshconstruction · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
317.6%1.3%1.8%₹5,350 est.₹40.1 LUnder construction
Dec 2026
Kamalraj Dattavihar E And H
Kamalraj Estate · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
317.6%1.4%1.7%₹5,350 est.₹40.1 LUnder construction
Dec 2025
Krystal One Phase II
Rama Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
297.6%1.4%1.7%₹5,350 est.₹40.1 LUnder construction
Aug 2026
addressOne - Phase 6
Peninsula Land · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
277.6%1.5%1.9%₹9,100 est.₹68.3 LUnder construction
Jun 2026
Celestial City Phase II Building I, J, K
Rama Synergy Spaces · Ravet / Kiwale / Moshi / Chikhali / Dehu Road
257.6%1.4%1.7%₹5,350 est.₹40.1 LUnder construction
May 2026

Price per sq ft in Ravet / Kiwale / Moshi / Chikhali / Dehu Road: what the evidence says

Date₹ / sq ftBasisConfidence
2021-06₹5,500pun (derived)40%
2023-06₹6,000pun (derived)45%
2025-06₹7,000pun (derived)50%
2026-06₹7,500pun (derived)50%

That is 6.4% a year from 2021-06 to 2026-06. The model projects 7.6% a year from here; the growth story on each project page shows why.

Infrastructure pipeline

ProjectTypeStatusExpectedChance it lands on timePrice effect if it does
Metro extensions PCMC–Nigdi and Swargate–Katrajmetroconstruction202760%+0.8% / yr
Pune Ring Road (PMRDA)roadconstruction202945%+0.8% / yr

The growth model counts each event at its probability, not its promise. Dates are the latest public schedule.

Developers active in Ravet / Kiwale / Moshi / Chikhali / Dehu Road

Ranked lists for Ravet / Kiwale / Moshi / Chikhali / Dehu Road

Ravet / Kiwale / Moshi / Chikhali / Dehu Road compared with other areas

Questions people ask

Is Ravet / Kiwale / Moshi / Chikhali / Dehu Road good for investment?

On PropertyLens's model the median analysed project in Ravet / Kiwale / Moshi / Chikhali / Dehu Road scores 44/100 (below the Pune average), with projected price growth of 7.6% a year over five years, median price ₹5,350 per sq ft and gross rental yield 3.3%. 130 RERA-registered projects analysed as of November 11, 2026. The best-scored project is Little Earth, Kiwale - Building B7 at 54.

What is the price per sq ft in Ravet / Kiwale / Moshi / Chikhali / Dehu Road?

Median ₹5,350 per sq ft of super built-up area across analysed projects, modelled from comparables where developers file no price. Entry price for an analysed home is about ₹22.1 L; the median home is ₹40.1 L.

What rental yield can I expect in Ravet / Kiwale / Moshi / Chikhali / Dehu Road?

Median gross yield 3.3% on the all-in cost of an analysed home, before maintenance, vacancy and tax. Net-wealth CAGR after every cost on an 8-year hold with a 75% loan is 2.4% at the median.

Are projects in Ravet / Kiwale / Moshi / Chikhali / Dehu Road delayed?

12 of 95 under-construction projects are past the completion date in their original RERA registration, and unsold stock equals about 20 months of sales. Each project page shows extensions, construction against bookings and complaints.

Scores and projections are model outputs built from dated public evidence (MahaRERA public filings, public ratings) and stated assumptions. Unit sizes and prices in this city are modelled estimates because the regulator does not publish unit inventories openly. They are research, not investment advice. How the numbers are built.

Share on WhatsApp