PropertyLensBengaluru · invest
Ranked list · as of September 11, 2026

Best 4 BHK flats in HSR Layout / BTM / Koramangala fringe

13 RERA-registered 4 BHK flats in HSR Layout / BTM / Koramangala fringe, ranked by investment score, not by advertising. Every project links to its full analysis, cost sheet and due-diligence report.

Straight answer · as of September 11, 2026

Top pick: Haven by Lodha (Macrotech)

Haven in HSR Layout / BTM / Koramangala fringe scores 85/100 with projected price growth of 10.9% a year, net-wealth CAGR 7.2% and cash-flow IRR 12.0%; the 4 BHK costs about ₹5.51 Cr (price modelled from comparables). Across all 13 4 BHK flats in HSR Layout / BTM / Koramangala fringe the median score is 71, median growth 10.0% a year, median price ₹13,650 per sq ft and median ticket ₹3.26 Cr; 0 are ready to move in.

Projects
13
0 ready · 13 under construction
Median score
71
50 = Bengaluru average
Median growth / yr
10.0%
5-yr projection
Median price
₹3.26 Cr
4 BHK

Top 6

All 13, ranked

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
Haven
Lodha (Macrotech) · HSR Layout / BTM / Koramangala fringe
8510.9%7.2%12.0%₹18,750 est.₹5.51 Cr
4 BHK
Under construction
Jun 2030
Mahindra Newhaven
Mahindra Lifespaces · HSR Layout / BTM / Koramangala fringe
8511.4%7.7%12.8%₹13,650 est.₹2.85 Cr
4 BHK
Under construction
Dec 2029
Mahindra Zen
Mahindra Lifespaces · HSR Layout / BTM / Koramangala fringe
8310.5%6.9%10.7%₹13,650 est.₹2.86 Cr
4 BHK
Under construction
Dec 2028
Radiance Platinum
Radiance Realty · HSR Layout / BTM / Koramangala fringe
789.9%5.5%8.7%₹10,650 est.₹2.60 Cr
4 BHK
Under construction
Aug 2029
Purva Meraki
Puravankara · HSR Layout / BTM / Koramangala fringe
729.6%5.7%8.5%₹13,650 est.₹3.69 Cr
4 BHK
Under construction
Oct 2027
Assetz Mizumi Reserve Tower A1 A2 A4
Assetz · HSR Layout / BTM / Koramangala fringe
7210.4%7.0%12.3%₹13,650 est.₹3.26 Cr
4 BHK
Under construction
Dec 2030
SNN Estates Duomont
SNN · HSR Layout / BTM / Koramangala fringe
7110.4%7.0%12.4%₹13,650 est.₹3.98 Cr
4 BHK
Under construction
Dec 2030
Sobha Infinia Phase 2A Block 5 Wing 5
Sobha · HSR Layout / BTM / Koramangala fringe
7010.0%6.1%10.2%₹13,650 est.₹2.90 Cr
4 BHK
Under construction
Jun 2030
Casagrand Flamingo
Casagrand · HSR Layout / BTM / Koramangala fringe
699.8%5.7%7.3%₹14,050 est.₹3.08 Cr
4 BHK
Under construction
Sep 2026
Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2
Sobha · HSR Layout / BTM / Koramangala fringe
6910.0%6.6%11.6%₹13,650 est.₹3.64 Cr
4 BHK
Under construction
Dec 2030
Shriram Esquire
Shriram Properties · HSR Layout / BTM / Koramangala fringe
689.7%5.3%7.0%₹14,050 est.₹3.05 Cr
4 BHK
Under construction
Jan 2027
Raj Etternia E Block (building 4)
SNN · HSR Layout / BTM / Koramangala fringe
639.4%5.4%7.0%₹14,050 est.₹3.30 Cr
4 BHK
Under construction
Apr 2026
Assetz Mizumi Reserve Tower A3 A5
Assetz · HSR Layout / BTM / Koramangala fringe
529.1%5.6%9.9%₹13,650 est.₹3.26 Cr
4 BHK
Under construction
Mar 2031

Related lists

Scores and projections are model outputs built from dated public evidence (Karnataka RERA filings, promoter quarterly updates, complaint registers, public ratings) and stated assumptions. They are research, not investment advice. How the numbers are built.

Share on WhatsApp