PropertyLensBengaluru · invest
Ranked list · as of September 11, 2026

New flats launched 2025–2026 in South Bengaluru

40 RERA-registered new flats (launched 2025–2026) in South Bengaluru, ranked by investment score, not by advertising. Every project links to its full analysis, cost sheet and due-diligence report.

Straight answer · as of September 11, 2026

Top pick: Haven by Lodha (Macrotech)

Haven in HSR Layout / BTM / Koramangala fringe scores 85/100 with projected price growth of 10.9% a year, net-wealth CAGR 7.2% and cash-flow IRR 12.0%; the default home costs about ₹2.06 Cr (price modelled from comparables). Across all 40 new flats (launched 2025–2026) in South Bengaluru the median score is 56, median growth 10.4% a year, median price ₹7,350 per sq ft and median ticket ₹1.00 Cr; 0 are ready to move in.

Projects
40
0 ready · 40 under construction
Median score
56
50 = Bengaluru average
Median growth / yr
10.4%
5-yr projection
Median price
₹1.00 Cr
default home

Top 6

All 40, ranked

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
Haven
Lodha (Macrotech) · HSR Layout / BTM / Koramangala fringe
8510.9%7.2%12.0%₹18,750 est.₹2.06 CrUnder construction
Jun 2030
Mahindra Newhaven
Mahindra Lifespaces · HSR Layout / BTM / Koramangala fringe
8511.4%7.7%12.8%₹13,650 est.₹2.31 CrUnder construction
Dec 2029
Vaishnavi At-One Krishna Brindavan
Vaishnavi Group · Jayanagar / Basavanagudi / Banashankari
8411.3%7.0%11.8%₹10,800 est.₹1.76 CrUnder construction
Jun 2030
Prestige Southern Star
Prestige · Bannerghatta Road / JP Nagar / Arekere
8310.8%6.4%10.0%₹10,350 est.₹64.2 LUnder construction
Sep 2029
Azur Phase 2
Lodha (Macrotech) · Bannerghatta Road / JP Nagar / Arekere
8011.6%7.8%13.7%₹13,800 est.₹1.87 CrUnder construction
Dec 2030
Godrej Vanantara
Godrej Properties · Bannerghatta Road / JP Nagar / Arekere
8011.5%7.3%13.1%₹10,350 est.₹1.27 CrUnder construction
May 2031
Sobha Magnus
Sobha · Bannerghatta Road / JP Nagar / Arekere
8011.4%6.8%11.5%₹10,350 est.₹1.94 CrUnder construction
May 2030
Azur Tower D
Lodha (Macrotech) · Bannerghatta Road / JP Nagar / Arekere
7511.3%7.0%11.8%₹13,800 est.₹1.89 CrUnder construction
Apr 2030
Purva Heritage
Puravankara · HSR Layout / BTM / Koramangala fringe
7510.3%6.5%10.9%₹13,650 est.₹1.54 CrUnder construction
Aug 2030
Opera Akshar
Opera Structures · Jayanagar / Basavanagudi / Banashankari
7310.4%5.8%8.6%₹10,800 est.₹1.97 CrUnder construction
Aug 2028
Assetz Mizumi Reserve Tower A1 A2 A4
Assetz · HSR Layout / BTM / Koramangala fringe
7210.4%7.0%12.3%₹13,650 est.₹2.65 CrUnder construction
Dec 2030
SNN Estates Duomont
SNN · HSR Layout / BTM / Koramangala fringe
7110.4%7.0%12.4%₹13,650 est.₹2.35 CrUnder construction
Dec 2030
Sobha Infinia Phase 2B Block 4 W1 and Block 3 W2
Sobha · HSR Layout / BTM / Koramangala fringe
6910.0%6.6%11.6%₹13,650 est.₹2.65 CrUnder construction
Dec 2030
Grc Sapphire Spring Phase II
GRC Infra · Bannerghatta Road / JP Nagar / Arekere
6710.5%6.7%12.9%₹8,000 est.₹85.2 LUnder construction
Mar 2032
Purva Silversky
Puravankara · Electronic City / Hosur Road / Bommasandra
6510.0%4.5%7.7%₹7,350 est.₹1.17 CrUnder construction
Jul 2030
Rainbow Uno
Rainvas Infraa · Jayanagar / Basavanagudi / Banashankari
6410.2%6.3%11.2%₹10,800 est.₹2.02 CrUnder construction
Jun 2031
Grc Sapphire Spring - Phase -3
GRC Infra · Bannerghatta Road / JP Nagar / Arekere
6310.0%5.8%9.7%₹8,000 est.₹38.4 LUnder construction
Jul 2030
Prestige Suncrest
Prestige · Electronic City / Hosur Road / Bommasandra
629.4%4.2%6.1%₹7,350 est.₹45.2 LUnder construction
Sep 2028
Assetz Ren & Rei
Assetz · Electronic City / Hosur Road / Bommasandra
599.1%3.7%5.9%₹7,350 est.₹1.27 CrUnder construction
Jan 2029
Adarsh Welkin Park Phase 2
Akarshak Realty · Electronic City / Hosur Road / Bommasandra
569.1%4.0%6.7%₹5,850 est.₹37.4 LUnder construction
Mar 2030
Sobha Hamptons -Townpark Phase 1 W4 to 6
Sobha · Attibele / Anekal / Chandapura
5211.1%6.0%11.1%₹6,100 est.₹1.06 CrUnder construction
Jun 2031
Assetz Mizumi Reserve Tower A3 A5
Assetz · HSR Layout / BTM / Koramangala fringe
529.1%5.6%9.9%₹13,650 est.₹2.65 CrUnder construction
Mar 2031
Sobha Madison Heights-Townpark Phase 1 W5 to 7
Sobha · Attibele / Anekal / Chandapura
5110.9%6.4%11.8%₹6,100 est.₹41.5 LUnder construction
Dec 2030
Shriram Songs Of The Earth
Shriram Properties · Attibele / Anekal / Chandapura
4911.1%5.9%10.2%₹6,100 est.₹70.8 LUnder construction
Apr 2030
Assetz Muse & Maison
Assetz · Electronic City / Hosur Road / Bommasandra
498.4%3.2%5.4%₹7,350 est.₹1.25 CrUnder construction
Mar 2030
Sobha Madison Heights-Townpark Phase 2 W1 to 4
Sobha · Attibele / Anekal / Chandapura
4810.5%7.0%14.7%₹6,100 est.₹73.5 LUnder construction
Dec 2032
Sobha Hamptons -Townpark Phase 2 W1 to 3
Sobha · Attibele / Anekal / Chandapura
4710.6%6.8%14.5%₹6,100 est.₹88.1 LUnder construction
Jun 2033
M5 Echelon
Mahendra Homes · Electronic City / Hosur Road / Bommasandra
479.1%4.3%8.7%₹5,850 est.₹84.5 LUnder construction
Dec 2031
Abhee Serenity Springs
Abhee Ventures · Attibele / Anekal / Chandapura
4610.2%4.4%7.7%₹4,700 est.₹46.3 LUnder construction
Jun 2030
Ls Sakura
Living Structures · Attibele / Anekal / Chandapura
4610.0%4.8%9.0%₹4,700 est.₹53.6 LUnder construction
Dec 2030
Orchid South Park
Goyal & Co · Electronic City / Hosur Road / Bommasandra
458.6%3.7%6.8%₹7,350 est.₹83.1 LUnder construction
Apr 2031
Signature Regal
Signature Dwellings · Attibele / Anekal / Chandapura
4310.4%4.8%9.1%₹4,700 est.₹56.9 LUnder construction
Jul 2031
Bren Park City
Bren Corporation · Electronic City / Hosur Road / Bommasandra
418.5%3.5%5.5%₹7,350 est.₹43.7 LUnder construction
Jun 2029
Mahendra Solterra Aarya Phase-2
Mahendra Homes · Electronic City / Hosur Road / Bommasandra
418.6%3.4%6.3%₹5,850 est.₹84.2 LUnder construction
Dec 2030
Ds Max Spoorthi Nest
DS-MAX · Attibele / Anekal / Chandapura
3910.5%5.3%9.9%₹4,700 est.₹44.6 LUnder construction
Dec 2030
Subha Eden-2
Subha Luxury (SubhaGruha) · Attibele / Anekal / Chandapura
3810.7%3.9%5.1%₹4,700 est.₹1.06 CrUnder construction
Dec 2026
Subha Eden - 1
Subha Luxury (SubhaGruha) · Attibele / Anekal / Chandapura
3810.7%3.9%5.1%₹4,700 est.₹1.00 CrUnder construction
Dec 2026
Ds Max Sky Stanza
DS-MAX · Attibele / Anekal / Chandapura
3710.1%5.0%9.3%₹4,700 est.₹45.1 LUnder construction
Oct 2030
Ls Mark IX
Living Structures · Attibele / Anekal / Chandapura
3610.0%4.5%7.8%₹4,700 est.₹64.4 LUnder construction
Dec 2029
Ds Max Sky Sampadha
DS-MAX · Attibele / Anekal / Chandapura
3610.2%5.1%9.5%₹4,700 est.₹49.1 LUnder construction
Oct 2030

Related lists

Scores and projections are model outputs built from dated public evidence (Karnataka RERA filings, promoter quarterly updates, complaint registers, public ratings) and stated assumptions. They are research, not investment advice. How the numbers are built.

Share on WhatsApp