PropertyLensBengaluru · invest
Ranked list · as of September 11, 2026

Best flats under ₹2 crore in South Bengaluru

235 RERA-registered flats under ₹2 crore in South Bengaluru, ranked by investment score, not by advertising. Every project links to its full analysis, cost sheet and due-diligence report.

Straight answer · as of September 11, 2026

Top pick: Vaishnavi At-One Krishna Brindavan by Vaishnavi Group

Vaishnavi At-One Krishna Brindavan in Jayanagar / Basavanagudi / Banashankari scores 84/100 with projected price growth of 11.3% a year, net-wealth CAGR 7.0% and cash-flow IRR 11.8%; the default home costs about ₹1.76 Cr (price modelled from comparables). Across all 235 flats under ₹2 crore in South Bengaluru the median score is 46, median growth 9.2% a year, median price ₹7,350 per sq ft and median ticket ₹87.2 L; 58 are ready to move in.

Projects
235
58 ready · 177 under construction
Median score
46
50 = Bengaluru average
Median growth / yr
9.2%
5-yr projection
Median price
₹87.2 L
default home

Top 6

All 235, ranked

ProjectScoreGrowth / yrNet-wealth CAGRCash-flow IRRPrice / sq ftPriceStatus
Vaishnavi At-One Krishna Brindavan
Vaishnavi Group · Jayanagar / Basavanagudi / Banashankari
8411.3%7.0%11.8%₹10,800 est.₹1.76 CrUnder construction
Jun 2030
Prestige Southern Star
Prestige · Bannerghatta Road / JP Nagar / Arekere
8310.8%6.4%10.0%₹10,350 est.₹64.2 LUnder construction
Sep 2029
Mahindra Zen
Mahindra Lifespaces · HSR Layout / BTM / Koramangala fringe
8310.5%6.9%10.7%₹13,650 est.₹1.77 CrUnder construction
Dec 2028
Assetz Canvas & Cove 2.0 - Block A
Assetz · Bannerghatta Road / JP Nagar / Arekere
8110.5%6.7%10.4%₹10,650 est.₹45.3 LUnder construction
Apr 2029
Azur Phase 2
Lodha (Macrotech) · Bannerghatta Road / JP Nagar / Arekere
8011.6%7.8%13.7%₹13,800 est.₹1.87 CrUnder construction
Dec 2030
Godrej Vanantara
Godrej Properties · Bannerghatta Road / JP Nagar / Arekere
8011.5%7.3%13.1%₹10,350 est.₹1.27 CrUnder construction
May 2031
Sobha Magnus
Sobha · Bannerghatta Road / JP Nagar / Arekere
8011.4%6.8%11.5%₹10,350 est.₹1.94 CrUnder construction
May 2030
Radiance Platinum
Radiance Realty · HSR Layout / BTM / Koramangala fringe
789.9%5.5%8.7%₹10,650 est.₹2.00 CrUnder construction
Aug 2029
Assetz Canvas & Cove 2.0 – Block B & C
Assetz · Bannerghatta Road / JP Nagar / Arekere
7810.1%6.6%10.2%₹10,650 est.₹42.1 LUnder construction
Oct 2028
Brigade Komarla Heights
Brigade Group · Jayanagar / Basavanagudi / Banashankari
779.1%6.0%7.8%₹15,500 est.₹1.61 CrReady
Azur
Lodha (Macrotech) · Bannerghatta Road / JP Nagar / Arekere
7611.5%7.4%12.4%₹13,800 est.₹1.89 CrUnder construction
Oct 2029
Grc Sapphire Spring - Phase -1
GRC Infra · Bannerghatta Road / JP Nagar / Arekere
7510.9%6.8%12.2%₹8,000 est.₹87.2 LUnder construction
Dec 2030
Azur Tower D
Lodha (Macrotech) · Bannerghatta Road / JP Nagar / Arekere
7511.3%7.0%11.8%₹13,800 est.₹1.89 CrUnder construction
Apr 2030
Purva Heritage
Puravankara · HSR Layout / BTM / Koramangala fringe
7510.3%6.5%10.9%₹13,650 est.₹1.54 CrUnder construction
Aug 2030
Opera Akshar
Opera Structures · Jayanagar / Basavanagudi / Banashankari
7310.4%5.8%8.6%₹10,800 est.₹1.97 CrUnder construction
Aug 2028
Raj Bay Vista
SNN · Bannerghatta Road / JP Nagar / Arekere
7210.5%6.3%9.9%₹10,350 est.₹1.16 CrUnder construction
Nov 2028
Assetz Canvas & Cove - Phase 1 Wing A & B
Assetz · Bannerghatta Road / JP Nagar / Arekere
729.7%5.5%7.6%₹10,650 est.₹73.5 LUnder construction
Apr 2027
Windchimes Phase 2
Mahindra Lifespaces · Bannerghatta Road / JP Nagar / Arekere
709.1%5.4%7.0%₹11,000 est.₹1.65 CrReady
SNN Raj Etternia
SNN · HSR Layout / BTM / Koramangala fringe
708.8%6.9%8.7%₹14,500 est.₹71.0 LReady
Prestige Song Of The South -Phase-2
Prestige · Bannerghatta Road / JP Nagar / Arekere
709.1%5.4%7.0%₹11,000 est.₹1.65 CrReady
Casagrand Amor
Casagrand · Bannerghatta Road / JP Nagar / Arekere
7010.5%6.7%9.7%₹10,350 est.₹49.7 LUnder construction
Feb 2028
V2 Rishi Rathna
V2 Holdings Housing Development · Jayanagar / Basavanagudi / Banashankari
699.3%6.2%8.0%₹11,500 est.₹1.33 CrReady
Casagrand Flamingo
Casagrand · HSR Layout / BTM / Koramangala fringe
699.8%5.7%7.3%₹14,050 est.₹1.69 CrUnder construction
Sep 2026
Windchimes Phase 1
Mahindra Lifespaces · Bannerghatta Road / JP Nagar / Arekere
689.1%5.4%7.0%₹11,000 est.₹1.65 CrReady
Shriram Esquire
Shriram Properties · HSR Layout / BTM / Koramangala fringe
689.7%5.3%7.0%₹14,050 est.₹1.87 CrUnder construction
Jan 2027
Ds Max Sky Blossom
DS-MAX · Bannerghatta Road / JP Nagar / Arekere
6810.4%6.0%9.4%₹8,000 est.₹79.2 LUnder construction
Feb 2029
Ds Max Savera
DS-MAX · Jayanagar / Basavanagudi / Banashankari
679.3%6.0%7.8%₹11,500 est.₹1.73 CrReady
G Corp Residences
G Corp · HSR Layout / BTM / Koramangala fringe
678.8%6.2%7.8%₹11,000 est.₹1.29 CrReady
Grc Sapphire Spring Phase II
GRC Infra · Bannerghatta Road / JP Nagar / Arekere
6710.5%6.7%12.9%₹8,000 est.₹85.2 LUnder construction
Mar 2032
Abhee Riviera Royale
Abhee Ventures · HSR Layout / BTM / Koramangala fringe
669.3%5.1%6.6%₹10,650 est.₹1.21 CrUnder construction
Feb 2027
SNN Raj Serenity
SNN · Bannerghatta Road / JP Nagar / Arekere
669.2%6.1%7.8%₹11,000 est.₹75.9 LReady
Abhee Nandana
Abhee Ventures · HSR Layout / BTM / Koramangala fringe
668.8%6.0%7.6%₹11,000 est.₹1.47 CrReady
Opera Primus
Opera Structures · Bannerghatta Road / JP Nagar / Arekere
669.9%5.6%8.1%₹8,000 est.₹74.8 LUnder construction
Dec 2027
Prestige Song Of The South Phase I
Prestige · Bannerghatta Road / JP Nagar / Arekere
669.1%5.5%7.1%₹11,000 est.₹1.44 CrReady
Cityville Valmark
Valmark · Bannerghatta Road / JP Nagar / Arekere
6610.9%6.9%8.4%₹8,000 est.₹35.6 LUnder construction
Sep 2022
Vaishnavi Senate
Vaishnavi Group · Bannerghatta Road / JP Nagar / Arekere
659.5%4.3%5.6%₹8,000 est.₹1.20 CrUnder construction
Dec 2026
Casagrand Vivacity
Casagrand · Electronic City / Hosur Road / Bommasandra
659.6%4.8%7.5%₹7,350 est.₹41.9 LUnder construction
Apr 2029
Purva Silversky
Puravankara · Electronic City / Hosur Road / Bommasandra
6510.0%4.5%7.7%₹7,350 est.₹1.17 CrUnder construction
Jul 2030
Purva Westend Phase 1
Puravankara · HSR Layout / BTM / Koramangala fringe
6410.3%6.2%8.0%₹13,650 est.₹1.56 CrUnder construction
Dec 2018
Casagrand Hazen
Casagrand · Bannerghatta Road / JP Nagar / Arekere
649.7%5.4%7.4%₹10,650 est.₹61.2 LUnder construction
Jul 2027
Sound of Water Phase 1 by Puravankara
Puravankara · Bannerghatta Road / JP Nagar / Arekere
6410.2%5.7%7.3%₹10,650 est.₹73.5 LUnder construction
Dec 2019
Ds Max Senate
DS-MAX · Bannerghatta Road / JP Nagar / Arekere
639.0%5.9%7.4%₹8,500 est.₹74.8 LReady
Grc Sapphire Spring - Phase -3
GRC Infra · Bannerghatta Road / JP Nagar / Arekere
6310.0%5.8%9.7%₹8,000 est.₹38.4 LUnder construction
Jul 2030
Raj Etternia E Block (building 4)
SNN · HSR Layout / BTM / Koramangala fringe
639.4%5.4%7.0%₹14,050 est.₹1.44 CrUnder construction
Apr 2026
G R Luxuria
G R Promoters · HSR Layout / BTM / Koramangala fringe
638.8%5.8%7.4%₹11,000 est.₹1.86 CrReady
Purva Westend
Puravankara · HSR Layout / BTM / Koramangala fringe
639.8%6.2%7.8%₹14,050 est.₹96.9 LUnder construction
Dec 2018
Rbd Stillwaters-Block 2 Wing C
RBD Shelters · HSR Layout / BTM / Koramangala fringe
638.8%5.7%7.4%₹11,000 est.₹1.94 CrReady
Mahaveer Sitara
Mahaveer · Bannerghatta Road / JP Nagar / Arekere
6210.9%5.4%6.9%₹8,000 est.₹1.44 CrUnder construction
Mar 2025
Rain Bow Oaks
Rainvas Infraa · Bannerghatta Road / JP Nagar / Arekere
629.1%6.0%7.5%₹8,500 est.₹74.8 LReady
Prestige Suncrest
Prestige · Electronic City / Hosur Road / Bommasandra
629.4%4.2%6.1%₹7,350 est.₹45.2 LUnder construction
Sep 2028
Millennium
Vaishnodevi Lush Greens · Jayanagar / Basavanagudi / Banashankari
619.7%5.3%6.7%₹10,800 est.₹1.34 CrUnder construction
Apr 2022
HM Indigo 3.0(Lavender-Phase II of HM World City)
HM Constructions · Bannerghatta Road / JP Nagar / Arekere
619.1%5.4%6.9%₹8,500 est.₹1.27 CrReady
Dhiraan Lotus
Dhiraan Infrastructure · HSR Layout / BTM / Koramangala fringe
618.7%5.9%7.6%₹11,000 est.₹1.47 CrReady
Signature Splendor
Signature Dwellings · HSR Layout / BTM / Koramangala fringe
609.2%6.1%7.5%₹10,350 est.₹53.3 LUnder construction
Dec 2025
Keya Spring
Keya Homes · Bannerghatta Road / JP Nagar / Arekere
609.5%4.5%5.6%₹8,000 est.₹1.08 CrUnder construction
May 2024
Mahaveer Meridian
Reddy Structures · Bannerghatta Road / JP Nagar / Arekere
5910.0%5.0%6.4%₹8,250 est.₹95.7 LUnder construction
Aug 2018
Assetz Ren & Rei
Assetz · Electronic City / Hosur Road / Bommasandra
599.1%3.7%5.9%₹7,350 est.₹1.27 CrUnder construction
Jan 2029
Slv Millennial
SLV Builders & Developers · Bannerghatta Road / JP Nagar / Arekere
5910.9%5.9%7.4%₹8,000 est.₹82.4 LUnder construction
Dec 2024
Axis Vanam
Axis Concept Construction · Bannerghatta Road / JP Nagar / Arekere
599.1%5.9%7.5%₹8,500 est.₹77.8 LReady
Brillio and Commercial at Brigade Valencia
Brigade Group · Attibele / Anekal / Chandapura
5910.3%5.3%8.3%₹6,100 est.₹28.1 LUnder construction
Sep 2029

Showing the top 60. Use the home page filters for the full set.

Related lists

Scores and projections are model outputs built from dated public evidence (Karnataka RERA filings, promoter quarterly updates, complaint registers, public ratings) and stated assumptions. They are research, not investment advice. How the numbers are built.

Share on WhatsApp